Altuwaim, A and El-Rayes, K (2018) Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost. Journal of Construction Engineering and Management, 144(07).

Hasanzadeh, S, Esmaeili, B and Dodd, M D (2018) Examining the Relationship between Construction Workers’ Visual Attention and Situation Awareness under Fall and Tripping Hazard Conditions: Using Mobile Eye Tracking. Journal of Construction Engineering and Management, 144(07).

Hosseini, M R, Martek, I, Chileshe, N, Zavadskas, E K and Arashpour, M (2018) Assessing the Influence of Virtuality on the Effectiveness of Engineering Project Networks: “Big Five Theory” Perspective. Journal of Construction Engineering and Management, 144(07).

Hwang, S, Jebelli, H, Choi, B, Choi, M and Lee, S (2018) Measuring Workers’ Emotional State during Construction Tasks Using Wearable EEG. Journal of Construction Engineering and Management, 144(07).

Jordan Srour, F, Kiomjian, D and Srour, I M (2018) Automating the Use of Learning Curve Models in Construction Task Duration Estimates. Journal of Construction Engineering and Management, 144(07).

Karakhan, A A, Rajendran, S, Gambatese, J and Nnaji, C (2018) Measuring and Evaluating Safety Maturity of Construction Contractors: Multicriteria Decision-Making Approach. Journal of Construction Engineering and Management, 144(07).

Karimi, H, Taylor, T R B, Dadi, G B, Goodrum, P M and Srinivasan, C (2018) Impact of Skilled Labor Availability on Construction Project Cost Performance. Journal of Construction Engineering and Management, 144(07).

Konstantinou, E and Brilakis, I (2018) Matching Construction Workers across Views for Automated 3D Vision Tracking On-Site. Journal of Construction Engineering and Management, 144(07).

Lee, C Y, Chong, H and Wang, X (2018) Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model. Journal of Construction Engineering and Management, 144(07).

  • Type: Journal Article
  • Keywords: Trust model; Distrust model; Contract functions; Building information modeling (BIM); Engineering, procurement, and construction (EPC);
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001521
  • Abstract:
    Delivering building information modeling (BIM) requires a certain level of trust to make it more effective. However, the engineering, procurement, and construction (EPC) approach, which conventionally adopts transaction law, encourages each party to protect their legitimate interest. Consequently, EPC contracting parties operate within their own goals and procedures, in which trust is not a fundamental contracting strategy. In addition, distrust—which is commonly perceived as detrimental to the relationship—should receive more attention when examining the beneficial outcomes of the relationship. Contract research has emerged from focusing on the safeguarding of contract transactions and is currently moving toward coordination and contingency adaptability for its success. In this context, this paper proposes an integrative trust-based functional contracting model that describes how trust can enhance BIM performance in EPC projects. Thus, this paper contributes new knowledge of the proper use and harmonization of contract functions and provides significant insight for the construction industry to think beyond the traditional EPC contract setting for effective use of BIM.

Liu, J and Lu, M (2018) Constraint Programming Approach to Optimizing Project Schedules under Material Logistics and Crew Availability Constraints. Journal of Construction Engineering and Management, 144(07).

Masih-Tehrani, M and Ebrahimi-Nejad, S (2018) Hybrid Genetic Algorithm and Linear Programming for Bulldozer Emissions and Fuel-Consumption Management Using Continuously Variable Transmission. Journal of Construction Engineering and Management, 144(07).

Mirzaei, A, Nasirzadeh, F, Parchami Jalal, M and Zamani, Y (2018) 4D-BIM Dynamic Time–Space Conflict Detection and Quantification System for Building Construction Projects. Journal of Construction Engineering and Management, 144(07).

Sankaran, B and O’Brien, W J (2018) Impact of CIM Technologies and Agency Policies on Performance for Highway Infrastructure Projects. Journal of Construction Engineering and Management, 144(07).

Swei, O (2018) Long-Run Construction Cost Trends: Baumol’s Cost Disease and a Disaggregate Look at Building Material Price Dynamics. Journal of Construction Engineering and Management, 144(07).

Trinh, M T, Feng, Y and Jin, X (2018) Conceptual Model for Developing Resilient Safety Culture in the Construction Environment. Journal of Construction Engineering and Management, 144(07).